SWConsult were engaged to provide a technical specification for Podium and Pool Waterproofing which included extensive refurbishment of the surrounding areas of both the internal and the external pool and spa areas.

La Pacifique 2017_05_05

Pre-existing construction (1980 finishes)

La Pacifique 2017_05_05

Demolition commences.

La Pacifique 2017_05_05

Removal of structural up-stand beam. Pool back-propped awaiting replacement carbon fibre reinforcement.

La Pacifique 2017_05_23

Pool up-stern formed and poured.

La Pacifique 2017_06_06

Pool membrane complete.

IMG_5497

Pool tiling complete.