Facade Refurbishment

2008 – 2011

Facade After Remediation of Facade, Balconies, Windows and Balustrades

Facade After Remediation of Facade, Balconies, Windows and Balustrades

Starting in 2008 to 2011 we have been commissioned as Specifier and Superintending engineer.

Our initial inspection revealed significant leaks through the podium structure causing concrete cancer. We carried out various concrete testing including a cover meter survey, carbonation testing, chloride testing, cement content testing and directed excavation works. Our initial engagement was for a defects inspection and over the last 3 years we have had a pivotal role in consulting on the following refurbishment.

  • Windows and balcony glazing replacement works
  • Replacement of the balcony balustrades
  • Concrete repairs and protective and decorative façade membrane works.
  • Podium deck refurbishment
  • Pool refurbishment consultancy
  • Internal swimming pool refurbishment

 

Facade before remodel/refurbishment

Facade before remodel/refurbishment

The resort continues to be remodelled and we expect to be engaged to consult on the remainder of the grounds and external swimming pool in 2015.

 

<< Back to Projects Gallery