Post Tension Failure on Podium Deck, Sunshine Coast Resort

Completed 2013

We were originally engaged to consult on waterproofing during reconstruction works in 2013. As part of our due diligence  we noted cracks and delamination in the podium deck. The podium deck had been constructed using post tension concrete. We carried out a deconstruction inspection and found the post tensioning cables to be corroded. SWConsult wrote a specification for this to be rectified and ensured that the Contractor carried out the works in accordance to the specification.

 