img_3415

img_3420

img_3422

img_3414We were engaged to provide professional advice on cracking beneath a load bearing column on a podium on a commercial building. After viewing of the structural drawings and structural analysis, we determined a transfer beam had been missed during construction. We designed a certified retro- filled upstand beam together with carbon fibre reinforcement and necessary temporary propping